• The computer room requires extreme precision in load-bearing, power supply, cooling, and fire protection, and construction defects can lead to project failure
• Overseas electricity, data security, and environmental compliance standards are extremely strict, and approval cannot be obtained without professional evaluation
• IDC professional contractors are extremely scarce, and the risk of supplier selection mistakes is fatal
• Large investment scale, more changes, difficult cost control, huge overspend losses
• Professional third-party verification is required; if acceptance is not passed, it cannot go online for operation
• Supplier Assessment: Solve the problem of 'extremely scarce IDC specialized contractors and the fatal risk of choosing the wrong supplier,' accurately verifying the supplier's IDC specialized construction capabilities, with a focus on core aspects such as load-bearing, power supply, and cooling, to avoid the risk of project failure caused by selecting the wrong supplier
• Special Assessment: Addressing the issues of "extremely high construction precision requirements and strict compliance standards," carrying out special inspections according to IDC industry standards and local regulations, identifying risks related to construction precision, electricity, environmental protection, and data security, assisting in rectification closure, and preventing failures in compliance review
• Delivery Acceptance (TDD): Address the issue of 'cannot go live if acceptance is not passed' by conducting core data center metric verification from the perspective of a professional third party, assisting in problem rectification, and ensuring the project passes acceptance and goes live in one attempt
• Project QS Management: Address the problems of 'large investment, frequent changes, and easily overspending on costs,' strictly control construction costs throughout the entire process, manage cost increases caused by equipment and construction changes, and reduce huge overspending losses
• Whole-Process Project Management: Addressing the issue of 'difficult-to-control risks throughout the entire project process,' coordinating the entire project cycle, ensuring that data center construction meets the client's operational requirements, maintaining construction accuracy and compliance standards, and avoiding critical risks
With top-tier professional third-party capabilities, we mitigate the core construction risks of IDC, strictly control costs and compliance, ensure one-time acceptance and launch of the data center, reduce massive investment losses, and help clients achieve safe and efficient operation of overseas data centers
Supplier inspection, special evaluation, delivery acceptance (TDD), project QS management, full-process project management